Template – RACI Table
| ID | Measure | R (Responsible) | A (Accountable) | C (Consulted) | I (Informed) |
|---|---|---|---|---|---|
| M1 | Measure from Action Plan | Name / Role | Name / Role | Name / Role | Name / Role |
| M2 | |||||
| M3 |
R = executes · A = accountable · C = consulted · I = informed
The complete workshop deck is available for download on the Preparation page.